Fin Tube Cutting System
Fin Tubes are part of the Heat Recovery Steam Generator System (HRSG). Over time, the main header begins thinning and cracking due to water chemistry and temperature cycling which eventually requires the removal of the header.
|
Other Information: |
The repair scheme consisted of the replacement of the header, which required the cutting of 70 2” (50.8mm) dia. Fin Tubes. The project scope called for the tubes to be cut along the header as parallel to each other as possible. In addition, the fins needed to be removed 4” (101.6mm) back from the face. This project challenged Wachs to develop a unique machining system to meet the projects machining and turn around requirements. Wachs Solution:
Using the Fin Tube Machining System, the site schedule was met. The tube cutting process was performed in six hours and the Fin Tube machining was completed in less than 48 hours. |